§ 21.29.090. Permit modifications.
Latest version.
If a permittee revises or intends to revise operations (at a time other than permit extension) so that they are no longer consistent with the original application, a permit modification is required. The planning director shall determine whether the revision to operations requires a modification. Permit modification shall be processed in the same manner as original permits.
(Ord. No. 2006-01(S), § 1, 8-1-06)