§ 21.27.010. Application procedure.  


Latest version.
  • A.

    In order to obtain a permit, an applicant shall first complete and submit to the borough planning department a permit application, along with the fee listed in the most current Kenai Peninsula Borough Schedule of Rates, Charges and Fees. In addition to those items listed below, applicants shall provide any additional information the planning director deems appropriate and necessary to determine compliance with this chapter.

    1.

    Application Acceptance. Two permits must be obtained, on an application form provided by the planning department, prior to operating a CCRC within the boundaries of the borough: a site and facility permit and an operation permit. No CCRC permit application will be accepted by the borough unless a request for proposals or sole-source contract has been issued by the State of Alaska within the previous 180 days. In the case of issuance of a contract between a local government and the department of corrections, site/facility and operations permits are still required.

    2.

    CCRC Site and Facility Permit. The site and facility permit application shall include:

    a.

    location of the proposed site; and

    b.

    as-built and/or conceptual drawings for all buildings and structures.

    3.

    CCRC Operation Permit. The operation permit application shall include:

    a.

    a proposed organization chart of the operation identifying the lines of responsibility and general function of the operator and staff;

    b.

    a general description of the number and types of residents proposed;

    c.

    a description of the major programs offered on-site;

    d.

    general description of the security measures proposed to protect the public safety; and

    e.

    a description of the notice procedures to be employed with respect to escapees and evasions.

    4.

    At the discretion of the applicant, both permits under this section may be considered at the same planning commission meeting. If considered together, each permit must be approved, modified or disapproved by a separate vote of the planning commission.

(Ord. No. 2011-32, § 31, 9-20-11; Ord. No. 98-33, § 4, 2-16-99)